Convent Logo
Untitled Document
Header Image
nav_capcampaign
 
 

What's the Goal?


The proposed goal is to raise an additional $2 million over and above our normal Tithes & Offerings during the next 3 years, June 2009 – June 2012. This represents the needs and overall vision for Phase 1.

What’s the Vision?
The proposed usage for the funds raised in the campaign is as follows:

1) Purchase and install an Elevator for the Main Sanctuary building
An elevator will allow full access to all members of society that worship with us. The elevator would service the Lower level, street level, sanctuary level, and balcony level.

2) Complete projects that will make the Educational building compliant with ADA and safety standards
Complete the projects that prevent us from using the building to its fullest potential and obtain the certificate of occupancy. Then we can focus on using the space to meet the needs of our congregation and the community.

3) Renovate/Rehab all bathrooms in the Sanctuary building and on the first floor of the Educational building.
Our restroom facilities are in need of renovation for the sake of cleanliness, the safety of our membership and the general public. We should have new state-of-the-art restroom facilities throughout the building.

4) Invest in a new state-of-the-art sound system for the main sanctuary building.
Our sound system, speakers, microphones and control board need to be significantly upgraded in order to facilitate better hearing in every part of the sanctuary and the lecture hall. Additionally, the controls for the sound system should be moved to a location that more readily facilitates control of the system during worship.

 

 

Copyright 2009 Convent Avenue Baptist Church | All Rights Reserved | Site by The Church Online 
420 W 145th Street | New York, N.Y. 10031 | Tel: (212) 234-6767 | Fax: (212) 234-6019